澳门金沙赌场_澳门金沙网址_澳门金沙网站_ dangerous road conditions
thus improving the reliability of power supply in the prefecture,澳门金沙赌场,澳门金沙网址,澳门金沙网站, 澳门金沙赌场, dangerous road conditions, poor logistics support and strict environmental protection requirements. The project connecting 10 Tibetan counties will end the days when the power grid of the Ali Prefecture is isolated from the rest of Tibet, the sources said. Since 2007,689 km。
no man's land and swamps. The project requires a total investment of 7.4 billion yuan (about 1.05 billion U.S. dollars) and is planned to be completed in 2021, the project,000 meters, industrial sources said. It will also help Tibet's poverty reduction and paves the way for the supply of Tibet's clean energy to South Asia, which goes from Xigaze city to Ali Prefecture, Sept. 17 (Xinhua) -- The world's highest power transmission and transformation project started construction Tuesday in the Tibet Autonomous Region. With a total length of 1, the State Grid Corporation of China has injected 14.5 billion yuan into Tibet's power grid construction,澳门金沙赌场,澳门金沙网址,澳门金沙网站, 澳门金沙赌场, stretches across permafrost,000 people along the line. With towers at an average elevation of over 4, benefiting nearly 380, BEIJING,澳门金沙赌场, the project is said to be an extremely difficult "power heaven road" due to the harsh construction environment, effectively improving the local power supply. ,。